• Call : +7 (727) 352-70-80
  • infoQMOZ@psi-group.kz
  • ru
  • en
QMOZ
  • Home
  • About Сompany
    • About Us
    • QMOZ Strategy
    • QMOZ Team
    • Plant equipment
    • Media
  • Products
    • Metal structures
    • E-house
  • Projects
    • Steel Projects
    • E-house
  • Career
  • Contact Us
QMOZ
  • Home
  • About Сompany
    • About Us
    • QMOZ Strategy
    • QMOZ Team
    • Plant equipment
    • Media
  • Products
    • Metal structures
    • E-house
  • Projects
    • Steel Projects
    • E-house
  • Career
  • Contact Us

Latest News

Karachaganak project received modular substations
July 17, 2019
The first batch of locally produced structures delivered to KPO
December 17, 2018
QMOZ creates a fully automated production
August 9, 2018

Archives

  • July 2019
  • December 2018
  • August 2018
  • December 2017
  • November 2017
  • June 2016

Karachaganak project received modular substations

July 17, 2019
The Karachaganak project received modular substations of Kazakhstan production, the press service of the company Karachaganak Petroleum Operating B.V. reports (KPO). “As part of the implementation of the strategy for the development of the oil and gas industry of the Republic of Kazakhstan, initiatives to increase the local content and ...
More details

The first batch of locally produced structures delivered to KPO

December 17, 2018
  Karachaganak Petroleum Operating announced the supply of the first batch of Kazakhstan-made metal structures to the Karachaganak field, a Khabar 24 correspondent reports. They are made in Kazakhstan, at the Karasai machine-building plant of PiESAi, specifically for the project to remove production restrictions on gas. The Karasai Engineering Plant ...
More details

QMOZ creates a fully automated production

August 9, 2018
  A training center for the training of welders, metalworkers and highly qualified metallurgists will be opened at a new machine-building plant located in the Karasai district of Almaty region. The principle of the enterprise is based on digital technology. Now it has already been exported and plans to increase ...
More details

Karasai Machine-Building Plant launched production

December 7, 2017
The Karasai Machine-Building Plant   As part of the celebration of Industrialization Day, Nursultan Nazarbayev held a teleconference during which tens of new high-tech industries were launched. On the same day, on the land of the Karasai akim of Almaty region, Amandyk Batalov, Managing Director for Engineering Projects of the ...
More details

The output of QMOZ is up to 18 thousand tons of metal and steel structures per year

November 1, 2017
One of the new industrial facilities in our area has become Karasai Machine-Building Plant LLP. This is a promising production, which gives high-quality metal structures, and jobs, and solid injections into the state treasury. Director of the plant Sergey Tkachuk introduced us to the plant’s activities. It should be noted ...
More details

Television bridge with the Head of State for Industrialization Day

June 12, 2016
  Ceremony of awarding the winners of the Paryz and Altyn Sapa Prizes and the national teleconference “New Industrialization of the Country: Leap of the Kazakhstan Leopard”
More details
Awesome Image
Karasaysky Machine-Building Plant LLP (QMÓZ) This is a dynamically developing modern domestic production of high-quality metal structures and complete transformer substations.

Contacts

  • infoQMOZ@psi-group.kz
  • +7 (727) 352 70 80
  • Almaty region, Karasai district, s. Zharmuhambet, plot No. 1625
  • 08:00 - 17:00

Driving directions

Driving directions

Maps

Copyrights 2020. All Rights are Reserved by. webexpress