• Call : +7 (727) 352-70-80
  • infoQMOZ@psi-group.kz
  • ru
  • en
QMOZ
  • Home
  • About Сompany
    • About Us
    • QMOZ Strategy
    • QMOZ Team
    • Plant equipment
    • Media
  • Products
    • Metal structures
    • E-house
  • Projects
    • Steel Projects
    • E-house
  • Career
  • Contact Us
QMOZ
  • Home
  • About Сompany
    • About Us
    • QMOZ Strategy
    • QMOZ Team
    • Plant equipment
    • Media
  • Products
    • Metal structures
    • E-house
  • Projects
    • Steel Projects
    • E-house
  • Career
  • Contact Us

Project replacement of ShchSU 380V and TP-4

Replacement of 10 / 0.4 kV substation for TCO production needs. The project was completed in accordance with the requirements of the customer.

The main equipment installed inside the substation:
1. Switchgear 10kV manufactured by ABB.
2. Transformers 10 / 0.4kV manufactured by ABB.
3. Switchgear 0.4kV manufactured by ABB.
4. UPS system Gutor.
5. Air conditioning STULZ.

The scope of work also included the design of all internal and auxiliary systems of the substation, such as the HVAC system and the fire and gas detection system.

previous arrow
next arrow
previous arrownext arrow
Slider
Awesome Image
Karasaysky Machine-Building Plant LLP (QMÓZ) This is a dynamically developing modern domestic production of high-quality metal structures and complete transformer substations.

Contacts

  • infoQMOZ@psi-group.kz
  • +7 (727) 352 70 80
  • Almaty region, Karasai district, s. Zharmuhambet, plot No. 1625
  • 08:00 - 17:00

Driving directions

Driving directions

Maps

Copyrights 2020. All Rights are Reserved by. webexpress