As part of this project, the team faced the issue of updating the infrastructure of the TCO shift camp. To accomplish this task, we designed, manufactured and delivered to TCO 9 substations, which became the basis of the energy infrastructure of the village.
Substations were assembled using modern and reliable equipment.
The main equipment of the substations 10kV Switchgear, 10 / 0.4kV Transformers and 0.4kV Switchgear were manufactured by ABB.
Substation buildings were the first products of the Karasai Machine-Building Plant.