As part of the TCO Future Expansion Project, two container-type substations have been completed by our company in collaboration with Schneider Electric. Which should be an important part of the construction at the FGP site. A.
As part of this project, our team designed the building and the internal needs of the substation, such as:
1. Heating system ventilation and air conditioning (HVAC). This system is controlled by an Allen Bradley controller.
2. Fire and gas detection system. Which consists of the latest equipment from European and American manufacturers.
Also, as part of the project, the substation also installed:
1. Switchgear 35kV manufactured by Schneider Electric.
2. Switchgear 10kV manufactured by Schneider Electric.